Permits
Does a roof replacement need a building permit?
Usually yes. California's building code and Florida's statutes both make it unlawful to alter or repair a building without a permit from the local building official. The city or county building department decides the details, and the contract should say in writing who applies.
What the law says
California. CSLB quotes the California Building Standards Code: no building or structure may be "erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted or demolished unless a separate permit for each building or structure has first been obtained from the building official". Local departments publish their own lists of exempt minor work, so the reliable answer for a given address comes from the city or county counter.
Florida. Section 553.79(1)(a) makes it unlawful "to construct, erect, alter, modify, repair, or demolish any building within this state without first obtaining a permit therefor from the appropriate enforcing agency".
We have not read a statewide permit statute for Illinois or Washington for this guide. In those states, call the building department for the property's jurisdiction.
The permit and the license are linked
In California the permit question also decides the licensing question. CSLB says a license is required for any project that needs a building permit, whatever its price. A reroof that needs a permit therefore needs a licensed contractor even if someone quotes it under the $1,000 threshold.
Florida's clock
Florida uses the permit as a deadline. A contractor who takes more than 10 percent of the price as an initial payment must apply for the necessary permits within 30 days and start work within 90 days after they are issued (section 489.126). The issue of a permit is also one of the three events that fix the "official start date" which ends the 10-day storm cancellation right under section 489.147.
Four things to do
- Ask the building department whether your reroof needs a permit and what inspections follow.
- Have the contract name the party who applies and pays the fee.
- Ask for the permit number before tear-off starts.
- Keep the final inspection sign-off with the contract. A buyer or an insurer may ask for it later.
Be wary of a roofer who asks you to pull an owner's permit for work the roofer will do. The permit holder is the person the building department holds to the code.
Short answers
Who should pull the roofing permit, me or the roofer?
The contract should say. CSLB states that a California home improvement contract needs written direction as to who will get the necessary permits. A contractor who pulls the permit is on record with the building department for the job.
How soon must a Florida roofer apply for the permit?
Within 30 days of payment, if the initial payment was more than 10 percent of the contract price, unless the owner agreed in writing to a longer period or no permit is needed.
Sources
- CSLB, Do I Need a Building Permit for My Project?
- CSLB, What is a Contract?
- CSLB, What Type of Contractor Do I Need?
- Florida Statutes 553.79, Permits; applications; issuance; inspections
- Florida Statutes 489.126
- Florida Statutes 489.147